DATA CENTERS

CORE COOPERATIVE

ABOUT

GALLERY

CONTACT

The most cost-efficient, mission critical, high-availability technology environment on the planet.

Where you run your business actually matters. "Motivated by invention. Driven by perfection" is not just a tagline; it is a way of life and our commitment to our clients. No other facility in the world is built, functions, offers or looks like a Switch SUPERNAP. SUPERNAP facilities are the first and only carrier-neutral colocation data centers to be certified Tier IV Gold in Operations by the Uptime Institute. SUPERNAP data centers are also certified Tier IV in both Design and Facility categories. In addition to the Uptime Institute’s Tier IV Gold standards, Switch's SUPERNAP facilities meet and exceed the standards of IEEE, ANSI, ASHRAE, 24/7, ISO 9001, SAS 70/SSAE-16, BICSI, the Green Grid Association and more.

While many data centers are built and run by real estate developers, SUPERNAP thrives under the leadership of Rob Roy, whose passion is evolved ecosystems and data centers.

SUPERNAP Data Center Checklist

Facilities

  • Uptime-certified Tier IV Gold
  • Tier IV Gold operations, security and maintenance protocols
  • Supporting 40+ kW of power per cabinet at scale
  • 100% power and cooling uptime SLA
  • 6-method optimally-efficient cooling system
  • Patented Switch SHIELD: dual, independent 200-mph-rated roof decks
  • 24/7 on-site NOC, fire safety and security
  • All security staff directly employed by Switch
  • On-site, on-net member resources including office space and presentation/meeting rooms
  • 35,000+ sqft of office space available

Dual Campus, One-State Advantage

  • Nevada single-state tax advantage
  • Switch SUPERLOOP: 7 ms latency
  • Active/active
  • Just outside California's high tax enviornment
  • Just outside California's high power costs
  • Lowest diaster rating in the western U.S.
  • Both campus locations can run indefiitely without water
  • 1000+ collaborative client ecosystem
  • $3 trillion CORE Cooperative purchasing consortium

SUPERNAP Las Vegas

  • Up to 2.3 million sq. ft. of data center space
  • Up to 325 MVA of power
  • Annualized measured PUE of 1.18
  • Up to 43,000 cabinets
  • Located within 12-minute drive of McCarran International Airport

SUPERNAP Reno

  • Up to 6.2 million sq. ft. of data center space
  • Up to 650 MVA of power
  • Estimated PUE of 1.20
  • Up to 75,000 cabinets
  • Located within 22-minute drive of Reno-Tahoe International Airport

Connectivity

  • 50+ carriers with 26 carriers on-net
  • Dual-independent SUPERNAP IP Gateways (200+ Gbps Capacity)
  • D/DoS Mitigation Scrubbing Center

Cloud

  • 100+ cloud providers

Social Responsibility

  • G100: Switch SUPERNAP data centers run on 100% renewable energy
  • Millions of dollars committed to renewable and sustainable energy initiatives
  • $10 million committed to education initiatives
  • Socially responsible, community-focused culture

International Expansion

  • Global client growth demands driving the need for a presence in multiple geographic zones, worldwide innovation and redundancy

Las Vegas
Digital Exchange Campus

  • LAS VEGAS
    DIGITAL EXCHANGE CAMPUS
  • LAS VEGAS 1-6
  • LAS VEGAS 7
  • LAS VEGAS 8
  • LAS VEGAS 9
  • LAS VEGAS 10
  • LAS VEGAS 11
  • LAS VEGAS 12
  • TOTALS
  • Sq. Ft.
  • LAS VEGAS 1-6 88,383 Sq. Ft.
  • LAS VEGAS 7 515,047 Sq. Ft.
  • LAS VEGAS 8 436,248 Sq. Ft.
  • LAS VEGAS 9 471,248 Sq. Ft.
  • LAS VEGAS 10 343,436 Sq. Ft.
  • LAS VEGAS 11 343,436 Sq. Ft.
  • LAS VEGAS 12 168,040 Sq. Ft.
  • 2,365,838 Sq. Ft.
  • MVA
  • LAS VEGAS 1 - 6 Up To 15
  • LAS VEGAS 7 Up To 100
  • LAS VEGAS 8 Up To 50
  • LAS VEGAS 9 Up To 50
  • LAS VEGAS 10 Up To 40
  • LAS VEGAS 11 Up To 40
  • LAS VEGAS 12 Up To 30
  • Up To 325 MVA
  • Status
  • LAS VEGAS 1
  • LAS VEGAS 7
  • LAS VEGAS 8
  • LAS VEGAS 9
  • LAS VEGAS 10
  • LAS VEGAS 11
  • LAS VEGAS 12
  • Open Construction Planned

Tahoe Reno
Industrial Campus

  • TAHOE RENO
    INDUSTRIAL CAMPUS
  • TAHOE RENO 1
  • TAHOE RENO 2
  • TAHOE RENO 3
  • TAHOE RENO 4
  • TAHOE RENO 5
  • TAHOE RENO 6
  • TAHOE RENO 7
  • TOTALS
  • Sq. Ft.
  • TAHOE RENO 1 1,200,947 Sq. Ft.
  • TAHOE RENO 2 610,974 Sq. Ft.
  • TAHOE RENO 3 935,064 Sq. Ft.
  • TAHOE RENO 4 935,064 Sq. Ft.
  • TAHOE RENO 5 935,064 Sq. Ft.
  • TAHOE RENO 6 935,064 Sq. Ft.
  • TAHOE RENO 7 935,064 Sq. Ft.
  • 6,487,241 Sq. Ft.
  • MVA
  • TAHOE RENO 1 Up To 130
  • TAHOE RENO 2 Up To 70
  • TAHOE RENO 3 Up To 90
  • TAHOE RENO 4 Up To 90
  • TAHOE RENO 5 Up To 90
  • TAHOE RENO 6 Up To 90
  • TAHOE RENO 7 Up To 90
  • Up To 650 MVA
  • Status
  • TAHOE RENO 1
  • TAHOE RENO 2
  • TAHOE RENO 3
  • TAHOE RENO 4
  • TAHOE RENO 5
  • TAHOE RENO 6
  • TAHOE RENO 7
  • Open Construction Planned

Totals

  • GRAND TOTAL
  • TOTAL Sq. Ft. 8,853,079 Sq. Ft.
  • TOTAL MVA Up To 975 MVA
  • Status N/A
MOTIVATED BY INVENTION. DRIVEN BY PERFECTION. SCHEDULE A TOUR